Comment Deadline Apr 27 2020, Monday (Tonight) at 11:59 PM ET
Pipeline Safety; Request for Special Permit: Kinder Morgan Louisiana Pipeline, LLC This Notice document was issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA)https://www.regulations.gov/docket?D=PHMSA-2006-25803

Kinder Morgan Louisiana Pipeline LLC. (KMLP) requests a modification to Waiver Conditions section (28)(a) of Special Permit — PHMSA-2006-25803. Section (28)(a) states:
(28) Gas Quality Monitoring: Gas quality monitoring equipment must be installed to permit the operator to manage and limit the introduction of contaminants and free liquids into the pipeline. An acceptable gas quality monitoring and mitigation program must be instituted to not exceed the following limits: (a) H2S (0.25 grains per 100 standard cubic feet or 4 parts per million, maximum); KMLP requests to be allowed to increase the amount of H2S it monitors from 0.25 grains per 100 standard cubic feet to 0.50 grains per 100 standard…

View original post 1,001 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.